Our Pricing List
Pricing
Simple, Transparent Day‑Rate Pricing
I price most waterfront work on a half‑day or full‑day basis. This keeps things efficient, avoids nickel‑and‑diming, and allows me to focus on solving the most important issues while I’m on site.
Half Day – $400
Up to ~4 hours on site
Best for:
Punch‑out / punch‑list items
Small dock repairs
Hardware installs (ladders, cleats, bumpers)
Light pressure washing
Inspections or assessments
Full Day – $750
Up to ~8 hours on site
Best for:
Multiple repairs or longer task lists
Maintenance catch‑up
Combination repair + pressure washing
Contractor support or access work
Jobs where flexibility and availability matter
Specialty / Inspection Work
Pricing varies depending on scope.
This may include:
Subsurface inspections
ROV inspections and documentation
Contractor support or time-critical access work
Please reach out to discuss the project and I’ll provide a clear quote.
Contractor Note
For marine contractors, builders, and surveyors:
Day-rate support is available for punch-out / punch-list items, inspections, access work, and job support
Rates are structured to be easy to plug into active projects
Short-notice availability may be possible depending on schedule
If you’re a contractor looking for boat-based access or supplemental support on a job, feel free to reach out to discuss scope and timing.
Materials & Parts
Materials are billed separately at cost plus handling
I’m happy to install owner‑supplied materials when appropriate
What This Pricing Includes
Boat‑based access to docks and waterfront structures
Professional tools and equipment
Experience working in marine environments
Efficient, task‑focused work without hourly clock‑watching
Good to Know
Most work is scheduled by half-day or full-day blocks
Close-proximity docks may qualify for a reduced rate when multiple jobs can be completed in the same area on the same day
Travel between nearby docks may be combined when possible
Larger or ongoing projects can be discussed on a case-by-case basis
Most work is scheduled by half‑day or full‑day blocks
Travel between nearby docks may be combined when possible
Larger or ongoing projects can be discussed on a case‑by‑case basis
If you’re unsure which option fits your needs, feel free to reach out. I’m happy to talk through the scope and recommend the most efficient approach.